Nerses Sraidarian, Broker of Record at Big City Realty

Nerses Sraidarian

Broker of Record

One Bloor West

TBA

Toronto, Ontario

TBA

One Bloor West

Toronto, Ontario

Project by: Tridel

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Primary Features

Construction status
Under Construction
Address
1 Bloor St W
City
Toronto
Province
Ontario
Intersection
Yonge St and Bloor St W
Neighborhood
Yorkville, Bloor-Yonge
District
Downtown
Storeys
85
Sales status
Registration
Building type
Apartment,Commercial
Number of buildings
1

One Bloor West is the 85-storey tower rising at 1 Bloor Street West, on the southwest corner of Yonge and Bloor at the edge of Yorkville. Designed by Foster + Partners with Core Architects, it is planned at 308.6 metres and will be Canada’s first supertall building. Tridel has been retained as development, construction and sales manager, and the residential component sits above hotel and retail floors. Tridel has not yet published a suite count, floor plans or pricing.

This is a trophy address for end users and for investors who want the Yonge and Bloor interchange at their door. Bloor-Yonge Station connects Line 1 and Line 2 directly below, the Mink Mile shops of Bloor Street and the Yorkville restaurants and galleries are steps away, and the University of Toronto’s St. George campus, the Royal Ontario Museum, the Royal Conservatory and Rosedale are within a fifteen-minute walk. The Financial District is four subway stops south.

Status and pricing

Status: the tower is under construction and Tridel is taking registrations ahead of a sales relaunch; occupancy, starting price and deposit structure have not been released. Registered buyers will receive community information first. Figures are as published by the builder in November 2026 and change without notice. Big City Realty represents buyers at no additional cost. Contact us for floor plans, current incentives and platinum access.

Rendering courtesy of Tridel. Figures as published by the builder in November 2026; subject to change without notice. E. and O.E.

Location