Nerses Sraidarian, Broker of Record at Big City Realty

Nerses Sraidarian

Broker of Record

Queen Church

from $640,000

Toronto, Ontario

from $640,000

Queen Church

Toronto, Ontario

Project by: Tridel

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Primary Features

Construction status
Under Construction
Address
60 Queen St E
City
Toronto
Province
Ontario
Intersection
Queen St E and Church St
Neighborhood
Church-Yonge Corridor, Garden District
District
Downtown
Storeys
57
Sales status
Selling
Building type
Apartment
Number of buildings
1
Number of suites
445

Queen Church is a 57-storey condominium tower by Tridel and BAZIS at 60 Queen Street East, on the southeast corner of Queen and Church in the Church-Yonge Corridor. Roy Varacalli designed the tower, which rises behind restored heritage facades along Queen Street, with interiors by II BY IV DESIGN and about 445 suites. Current availability runs from studios to three bedrooms, with two bedroom suites on floors 37 to 57 and a furnished READY turnkey option.

The site is one of the best-connected in the city, which is why investors renting to students and hospital and office workers look at it. Queen Station on Line 1 is a block west, the Queen streetcar stops outside, and the Ontario Line’s Queen station is under construction beneath the street. The Eaton Centre, St. Michael’s Hospital, Toronto Metropolitan University, the Financial District and St. Lawrence Market are all within a ten-minute walk, and St. James Park is the nearest green space.

Status and pricing

Status: under construction, now selling, with tentative occupancy in Summer 2028. Published prices run from $640,000 for a studio to $1,271,000 for a three bedroom, net of the Ontario Enhanced New Home Rebate. The deposit schedule is not published on Tridel’s site. Figures are as published by the builder in November 2026 and change without notice. Big City Realty represents buyers at no additional cost. Contact us for floor plans, current incentives and platinum access.

Rendering courtesy of Tridel and BAZIS. Figures as published by the builder in November 2026; subject to change without notice. E. and O.E.

Location